Journal of Chengdu Sport University ›› 2016, Vol. 42 ›› Issue (5): 65-70.doi: 10.15942/j.jcsu.2016.05.011
• SPORTS HUMANITIES AND SOCIAL SCIENCE • Previous Articles Next Articles
LIU Ying, GAO Yang, WANG Shaoyuan
Received:
Online:
Published:
Abstract: The construction of school sports facilities is an important part of the reconstruction project after the 5·12 earthquake. Based on the surveys and questionnaires of 97 reconstruction schools, the article summarizes the lesson and experience in the reconstruction and utilization of school sports facilities after the earthquake, which include the number of school sports facilities, the principle of reconstruction, the sources of reconstruction funds, the assisting organization, the utilization and opening conditions, and puts forward some measures and suggestions for the reconstruction and utilization of school sports facilities so as to provide a reference for easing the tension between the demand of sports facilities for "sports for all"and their inadequacy.
Key words: The 5·12 Earthquake, School Sports Facilities, Reconstruction, Utilization
CLC Number:
G80-052
LIU Ying, GAO Yang, WANG Shaoyuan. Study on the Reconstruction and Utilization of School Sports Facilities after the 5·12 Earthquake[J]. Journal of Chengdu Sport University, 2016, 42(5): 65-70.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://cdtyxb.cdsu.edu.cn/EN/10.15942/j.jcsu.2016.05.011
http://cdtyxb.cdsu.edu.cn/EN/Y2016/V42/I5/65